Home › Reference

QS reference: rates and tables for Malaysia

The figures we reach for when a budget, a tender or a claim needs a sanity check, published for the industry: construction rates from our own Klang Valley tender pricing, and the tables every quantity surveyor keeps in a drawer.

RINGGIT MALAYSIA · KLANG VALLEY · UPDATED SEPTEMBER 2026

The rates are all-in trade rates from tenders and subcontractor quotations priced by WE Quantity Surveyor, given as ranges with the basis stated on each page, and they are text, not pictures, so they can be searched, copied into a spreadsheet and checked. They are a starting point for a pre-tender estimate or a check on someone else's; they are not a substitute for quotations on your own project, and they are revised as the market moves.

Need these rates applied to your drawings?

WE Quantity Surveyor measures and prices bills of quantities for contractors, developers and consultants across Malaysia and Singapore. Fixed fee, quoted within 24 hours.

Get a fixed-fee quote

Measuring the quantities yourself?

Take-Off by WEQS is our on-screen measurement software for Windows: open the PDF or CAD drawing, trace what you need, export to Excel. Free for 30 days, every feature on.

Try Take-Off by WEQS

Compiled by WE Quantity Surveyor, a BQSM-registered quantity surveying practice in Kuala Lumpur. Published as general guidance for the Malaysian construction industry; no liability is accepted for use on any particular project. Reproduction with a link to the page is welcome.